Through the preparing of your Doing work platform and before the beginning of the drilling, an investigation needs to be performed to assure the absence of any obstructions for the pile spots.Demolition of the excess concrete above the Minimize-off level shall be completed by operatives working with jackhammers.At present, the construction industry